Trace Compound Base Mat from Construction Approval to Delivered Roll
The useful traceability link is the one that connects your approved construction to the delivered material. Keep grade, sample and order references together instead of treating every compound mat as the same generic base.

Define the approved construction
Record standard or Leno designation, weight grade, width and the applicable technical requirement. Retain the specification revision and any approved sample reference.
A change from one mesh designation or weight grade to another should be visible in the purchasing record. A repeated product name alone does not establish unchanged construction.
Agree the identification available
Ask which roll, lot and packing references will accompany the order. Record the actual identifiers at receiving rather than inventing a numbering scheme the supplier has not confirmed.
Keep those references with samples used for incoming evaluation or production trials. Where the sample is cut from a roll, retain its relationship to the parent material.
Composite material record chain
On a phone, swipe the table sideways to see every column.
| Stage | Keep linked |
|---|---|
| Approval | Construction, grade and specification revision |
| Sample | Identity and origin |
| Order | Selected width and roll format |
| Delivery | Available roll / lot and packing references |
| Evaluation | Method and actual sample identity |
| Production | Material issue and resulting trial reference |

Separate technical requirements from results
The catalogue grade table states requirements for the listed constructions. A batch-specific document, where agreed and available, needs to identify the actual material it covers.
Do not label a generic table as the inspection result for your shipment. Request the required document type and scope before ordering.
Preserve the link through approval
Connect trial observations and finished sample identity to the raw reinforcement reference. If a construction change is approved, retain the new revision and its approval scope.
Send Merily your selected construction and required identification fields with the RFQ. Clear document requirements help quotation, receiving and production use the same material definition.
Questions for This Purchase
Is a catalogue table a batch certificate?
No. Confirm shipment-specific documentation separately.
Should a construction change be recorded?
Yes. Keep the revised grade and approval reference visible.
When should identification requirements be agreed?
Include them in the RFQ and confirm before ordering.
Send your specification.
Get a clear material quote.
Tell us what you produce, the material you need and your required roll format. Include the quantity and destination port so we can prepare the product and packing details together.
Useful details: thickness or basis weight, width, roll length or weight, core, quantity and application. For release film, add coated side and release requirements.
Standard production: approximately 10 days for one 40-ft container order. Customized specifications: approximately 10–15 days. Confirm the schedule with the final order.
