Skip to content
Materials for waterproofing membrane manufacturerssales@merilywaterproofing.com
For bituminous membrane manufacturers

Polyester Mat Moisture Content and Water Resistance: Read Separate Rows

A water-resistance entry is not a moisture-content limit. Keep the two properties separate so a raw reinforcement table is not mistaken for a finished membrane waterproofing claim.

Merily Waterproofing · Material Buying Guide
Reinforcement material rolls in the sample area.
Reinforcement material rolls in the sample area. · Select to enlarge

Begin with the published entries

The listed continuous-filament polyester grades show 0.50% moisture content and 95% water resistance. These are separate technical entries, not two descriptions of the same measurement.

The percentage by itself does not identify every detail of a test. Request the applicable definition and method where either property is part of purchase acceptance.

Do not turn a table heading into a new claim

The water-resistance label must not be rewritten as “95% waterproof” or used to claim that uncoated reinforcement is a finished waterproof barrier.

Likewise, the moisture-content entry is not an ambient relative-humidity setting for a warehouse. Material moisture and surrounding air humidity use different measurement definitions.

Keep these meanings separate

On a phone, swipe the table sideways to see every column.

EntryCorrect useAvoid
Moisture content: 0.50%Grade technical requirement; confirm methodWarehouse humidity instruction
Water resistance: 95%Confirm definition and evaluation basis“95% waterproof” claim
Wrapping conditionReceiving observation with photosSubstitute for laboratory result
Finished membraneEvaluate the complete constructionRaw-mat table as system certification
Continuous-filament polyester reinforcement roll.
Continuous-filament polyester reinforcement roll. · Select to enlarge

Keep the sample condition clear

Record the sample identity, conditioning information and test method applicable to your evaluation. If material is received with visibly damaged wrapping, document that observation separately from measured moisture.

A photograph can show the wrapping condition. It cannot establish the numerical moisture content or the value of an undefined water-resistance test.

State what your quality team needs

Include the grade, required property and method in your inquiry. If your internal specification uses a differently named moisture or water-related test, supply that wording rather than treating it as automatically equivalent.

Merily can discuss the selected reinforcement against your purchasing requirement. Confirm any requested order-specific documentation before the supply is finalized.

Questions for This Purchase

Does 95% mean the mat is a waterproof membrane?

No. Do not reinterpret the raw-material entry that way.

Does 0.50% specify warehouse humidity?

No. Material moisture content and air humidity are different quantities.

What if our specification uses another test name?

Send its definition and method for comparison before accepting equivalence.

For membrane manufacturers

Send your specification.
Get a clear material quote.

Tell us what you produce, the material you need and your required roll format. Include the quantity and destination port so we can prepare the product and packing details together.

Useful details: thickness or basis weight, width, roll length or weight, core, quantity and application. For release film, add coated side and release requirements.

sales@merilywaterproofing.com

Standard production: approximately 10 days for one 40-ft container order. Customized specifications: approximately 10–15 days. Confirm the schedule with the final order.

    We use your details to respond to this inquiry. Privacy policy.

    Request a Quote